The focus of this blog is construction-related topics. The purpose is discussion, so please feel free to comment! See Specific thoughts for thoughts from the daily life of a specifier.
23 May 2016
How did we get here? The good old days
A couple of years ago I wrote two articles about how the number of CSI members and CSI chapters How did we get here? Membership, which showed how total membership changed over the years, and How did we get here? Chapters, which looked at the change in the number of chapters during the same time.
One of the things that has plagued CSI for some time is a lack of a tangible something of value.
For a very long time, CSI offered useful things of real value. The first part of our membership curve suggests CSI must have had something that brought in new members and led to the creation of new chapters. Let's see if we can discover what that something was.
02 May 2016
Bylaws again?
I suspect most members have not read their chapter, region, or Institute bylaws. Until I became a chapter president in 2001, I gave them little attention myself; I figured they were someone else's problem. The general reluctance even to look at bylaws is not surprising; often written in the legalese we all love to hate, their very appearance can be intimidating, and it seems the only time we look at them is when we're in trouble.Why revise them again? Because we are in trouble.
12 April 2016
Please - say "Thank you!"
Among the first things parents drum into their children's heads are the words please and thank you. Parents do such a good job that these words become automatic, and, to a great extent, they become white noise. If they are used automatically, without conscious thought, what good are they? Do they mean anything? Why do we insist children use them, even if they don't mean what they say?
29 February 2016
The cost of custom
Many products offer not only a selection of standard finishes at a standard price, but offer more options at additional cost. Some will offer those options in price groups, such as Standard, Group 1, and Group 2, where each group is more expensive than the last. Finally, some manufacturers offer to match any color.Unfortunately, the requirements for getting a custom color often are vague, and a minimum quantity may be required or other limitations may apply.
The result? I may tell a project architect that a custom color will cost more, but because I often don’t know how much, the response usually is, “It doesn’t matter; we want custom.”
14 December 2015
Election time
![]() |
| Photo credit: User:RadioFan |
23 November 2015
Tell me again - and show me the money!
In the last few articles we looked at how redundancies needlessly increase the size of specifications. Another thing that affects the length of specifications is writing style. Even though CSI's mantra, "Clear, concise, correct, complete", suggests specifications should contain only the essence of requirements, commercial guide specifications and office master specifications alike tend to use words that aren't necessary.In 1949, Ben John Small wrote an article titled "The Case for the Streamlined Specification." In it, he uses anecdote and logic to explain why terse writing is superior to verbose. He also cites previous works that show that streamlined writing is nothing new, but has been advocated as far back as 1896.
In his opening remarks, Small said, "Streamlining is not and never has been considered a panacea or short cut in the writing of good specifications. If one can write a thorough and competent specification using the long form one can streamline that same specification without the slightest adulteration, yet reduce its bulk by one-third or more." Briefly, streamlining is the removal of all words that are not essential to understanding the specifications.
19 October 2015
Tell me again part 3
In "Tell me again part 1" we looked at how proper use of reference standards can reduce the amount of text required by making those standards part of the specifications. In "Tell me again part 2" we saw how proper use of Division 01 can eliminate repeated requirements in specification sections in other Divisions. Now let's look at redundancies found on drawings and in specifications.21 September 2015
Tell me again part 2
In "Tell me again part 1" we looked at how proper use of reference standards can reduce the amount of text required by making those standards part of the specifications. Going back to the "say it once" principal, proper use of Division 00 and Division 01 can go a long way toward eliminating needless text.In the good old days, it was common to include at the beginning of every specification section a statement similar to this: "Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division - 1 Specification Sections, apply to this Section."
CSI's Manual of Practice, Product Resource Manual, and Construction Specifications Practice Guide explain how to eliminate this statement:
Although the Division 01 role in governing the work has been accepted in practice for many years, this authority is not explicitly stated in either the AIA or EJCDC general conditions. Until that change is made, the authority should be established by a provision in the supplementary conditions as follows: Sections of Division 01-General Requirements govern the work of all sections of the specifications.